Welcome to the Efabless Open MPW Shuttle Program

MPW-3 is the third Open MPW Shuttle providing fabrication for fully open-source projects using the Open PDK announced by Google.

The shuttle provides opportunities for designers to experiment and push the state-of-the-art without having to reconcile the risk associated with the cost of fabrication.

The shuttle program is open to anyone, provided that their project is fully open source and meets the other program requirements. Costs for fabrication, packaging, evaluation boards and shipping are covered by Google for this program.

Project Submission Requirements

The following project requirements must be met in order to qualify for inclusion on the shuttle program:

  • The project must be targeted on the currently-supported Open PDK.
  • The project must be posted on a git-compatible repo and be publicly accessible.
  • The top-level of the project must include a LICENSE file for an approved open-source license agreement. Third-party source code must be identified and source code must contain proper headers. See details here.
  • The repo must include project documentation and adhere to Google's inclusive language guidelines. See details here.
  • The project must be fully open. The project must contain a GDSII layout, which must be reproducible from source contained in the project.
  • Projects must use a common test harness and padframe based on the Caravel repo. New projects should start by duplicating or forking the Caravel User Project repo and implementing their project using the user_project_wrapper. The Caravel repo is configured as a submodule in the project under the ‘caravel’ directory. Note -- you do not need to initialize nor clone the Caravel sub-directory to complete or submit your project. See the project README for further instructions. The projects must be implemented within the user space of the layout and meet all requirements for the Caravel.
  • Projects must successfully pass the Open MPW precheck tool, including LVS and DRC clean using the referenced versions of OpenLane flow. Projects should implement and pass a simulation testbench for their design integrated into Caravel. The Caravel User Project provides an example of how to implement this.

Schedule

  • September 17, 2021: Project submission is OPEN
  • November 15, 2021: Project submission is CLOSED at 23:59 PT
  • February 07, 2022: Wafer fabrication complete, packaging and assembly begins
  • April 04, 2022: Parts and assembled boards shipped to project owners

FAQs

  • See the following page

Timeline

Tapeout: Nov 15, 2021 at 11:59 PT
Delivery: Apr 2022

Status

Closed
on Nov 15, 2021 at 11:59 PT

Process

SKY130A
Skywater 130nm

Participants

3
0 New Users

Projects

25
0 from new users

Capacity

25 / 40
62.0 % Undersubscribed
1
Submission
2
Tapeout
3
Fabrication
4
Close
Open
Sep 17, 2021
Tapeout
Nov 15, 2021
Assembly
Feb 07, 2022
Delivery
Apr 04, 2022
`

Loading ...

Loading ...

Loading ...

Loading ...

Update #1
Matt Long | Efabless | Jul 08, 2022

and another

dsfsadf

Project submission deadline has passed