Efabless Logo
MPW-2
Open MPW Shuttle Service

Welcome to the Efabless Open MPW Shuttle Program

MPW-2 is the second Open MPW Shuttle providing fabrication for fully open-source projects using the Open PDK announced by Google.

The shuttle provides opportunities for designers to experiment and push the state-of-the-art without having to reconcile the risk associated with the cost of fabrication.

The shuttle program is open to anyone, provided that their project is fully open source and meets the other program requirements. Costs for fabrication, packaging, evaluation boards and shipping are covered by Google for this program.

Project Submission Requirements

The following project requirements must be met in order to qualify for inclusion on the shuttle program:

  • The project must be targeted on the currently-supported Open PDK.
  • The project must be posted on a git-compatible repo and be publicly accessible.
  • The top-level of the project must include a LICENSE file for an approved open-source license agreement. Third-party source code must be identified and source code must contain proper headers. See details here.
  • The repo must include project documentation and adhere to Google's inclusive language guidelines. See details here.
  • The project must be fully open. The project must contain a GDSII layout, which must be reproducible from source contained in the project.
  • Projects must use a common test harness and padframe based on the Caravel repo. New projects should start by duplicating or forking the Caravel User Project repo and implementing their project using the user_project_wrapper. The Caravel repo is configured as a submodule in the project under the ‘caravel’ directory. Note -- you do not need to initialize nor clone the Caravel sub-directory to complete or submit your project. See the project README for further instructions. The projects must be implemented within the user space of the layout and meet all requirements for the Caravel.
  • Projects must successfully pass the Open MPW precheck tool, including LVS and DRC clean using the referenced versions of OpenLane flow. Projects should implement and pass a simulation testbench for their design integrated into Caravel. The Caravel User Project provides an example of how to implement this.

Schedule

  • April 08, 2021: Project submission is OPEN
  • June 18, 2021: Project submission is CLOSED at 23:59 PT
  • October 20, 2021: Wafer fabrication complete, packaging and assembly begins
  • December 06, 2021: Parts and assembled boards shipped to project owners

FAQs

  • See the following page

Timeline

Tapeout: Jun 18, 2021 at 11:59 PT
Delivery: Dec 2021

Status

Closed
on Jun 18, 2021 at 11:59 PT

Process

SKY130A
Skywater 130nm

Participants

1
0 New Users

Projects

1
0 from new users

Capacity

1 / 0
2.0 % Undersubscribed
1
Submission
2
Tapeout
3
Fabrication
4
Close
Open
Apr 08, 2021
Tapeout
Jun 18, 2021
Assembly
Oct 20, 2021
Delivery
Dec 06, 2021
`

Loading ...

Loading ...

Loading ...

Loading ...

Update #1
Matt Long | Efabless | Jul 08, 2022

first announcement

sdfasdfasdfasdfasdf

Project submission deadline has passed