Efabless Logo
MPW-7
Open MPW Shuttle Service

Welcome to the Efabless Open MPW Shuttle Program

MPW-7 is the seventh Open MPW Shuttle providing fabrication for fully open-source projects using the Open PDK announced by Google.

The shuttle provides opportunities for designers to experiment and push the state-of-the-art without having to reconcile the risk associated with the cost of fabrication.

The shuttle program is open to anyone, provided that their project is fully open source and meets the other program requirements. Costs for fabrication, packaging, evaluation boards and shipping are covered by Google for this program.

Project Submission Requirements

The following project requirements must be met in order to qualify for inclusion on the shuttle program:

  • The project must be targeted on the currently-supported Open PDK.
  • The project must be posted on a git-compatible repo and be publicly accessible.
  • The top-level of the project must include a LICENSE file for an approved open-source license agreement. Third-party source code must be identified and source code must contain proper headers. See details here.
  • The repo must include project documentation and adhere to Google's inclusive language guidelines. See details here.
  • The project must be fully open. The project must contain a GDSII layout, which must be reproducible from source contained in the project.
  • Projects must use a common test harness and padframe based on the Caravel repo. New projects should start by duplicating or forking the Caravel User Project repo and implementing their project using the user_project_wrapper. The Caravel repo is configured as a submodule in the project under the ‘caravel’ directory. Note -- you do not need to initialize nor clone the Caravel sub-directory to complete or submit your project. See the project README for further instructions. The projects must be implemented within the user space of the layout and meet all requirements for the Caravel.
  • Projects must successfully pass the Open MPW precheck tool, including LVS and DRC clean using the referenced versions of OpenLane flow. Projects should implement and pass a simulation testbench for their design integrated into Caravel. The Caravel User Project provides an example of how to implement this.

Schedule

  • July 02, 2022: Project submission is OPEN
  • August 01, 2022: Project submission is CLOSED at 23:59 PT
  • September 01, 2022: Wafer fabrication complete, packaging and assembly begins
  • October 01, 2022: Parts and assembled boards shipped to project owners

FAQs

  • See the following page

Timeline

Tapeout: Aug 01, 2022 at 11:59 PT
Delivery: Oct 2022

Status

Closed
on Aug 01, 2022 at 11:59 PT

Process

SKY130A
Skywater 130nm

Participants

8
+ 1 New User

Projects

21
1 from new users

Capacity

21 / 40
52.0 % Undersubscribed
1
Submission
2
Tapeout
3
Fabrication
4
Close
Open
Jul 02, 2022
Tapeout
Aug 01, 2022
Assembly
Sep 01, 2022
Delivery
Oct 01, 2022
`

Loading ...

Loading ...

Loading ...

Loading ...

Update #1
Matt Long | Efabless | Jul 13, 2022

Big Important Announcement EDIT

See attachments.  Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Netus et malesuada fames ac turpis egestas maecenas pharetra. Viverra orci sagittis eu volutpat odio. Augue ut lectus arcu bibendum at. Tellus mauris a diam maecenas sed. Quis risus sed vulputate odio. Risus quis varius quam quisque id diam vel. Gravida cum sociis natoque penatibus et magnis dis parturient montes. Ultrices tincidunt arcu non sodales neque. Quis eleifend quam adipiscing vitae. Rhoncus est pellentesque elit ullamcorper dignissim cras tincidunt lobortis feugiat. Diam ut venenatis tellus in metus vulputate eu scelerisque. Et ligula ullamcorper malesuada proin libero. Amet commodo nulla facilisi nullam vehicula ipsum a. Rhoncus mattis rhoncus urna neque viverra justo nec ultrices. Sed viverra ipsum nunc aliquet. Ipsum nunc aliquet bibendum enim.

Update #2
Matt Long | Efabless | Jul 13, 2022

Another Thing New BLAH

Also please don't forget Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Netus et malesuada fames ac turpis egestas maecenas pharetra. Viverra orci sagittis eu volutpat odio. Augue ut lectus arcu bibendum at. Tellus mauris a diam maecenas sed. Quis risus sed vulputate odio. Risus quis varius quam quisque id diam vel. Gravida cum sociis natoque penatibus et magnis dis parturient montes. Ultrices tincidunt arcu non sodales neque. Quis eleifend quam adipiscing vitae. Rhoncus est pellentesque elit ullamcorper dignissim cras tincidunt lobortis feugiat. Diam ut venenatis tellus in metus vulputate eu scelerisque. Et ligula ullamcorper malesuada proin libero. Amet commodo nulla facilisi nullam vehicula ipsum a. Rhoncus mattis rhoncus urna neque viverra justo nec ultrices. Sed viverra ipsum nunc aliquet. Ipsum nunc aliquet bibendum enim.

Update #3
Matt Long | Efabless | Jul 19, 2022

New Fabrication Date

Hello there is a new fabrication date that you will need to be aware of.

  • 7/14/2022

 

Update #4
Matt Long | Efabless | Sep 12, 2022

new announcement test sep 12

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

new announcement test sep 12.  BLAH BLAH BLUE

Update #5
Matt Long | Efabless | Sep 16, 2022

dev email test

dev email test

Update #6
Matt Long | Efabless | Sep 22, 2022

test

test

Update #7
Matt Long | Efabless | Oct 26, 2022

Another test from Matt Long

Another test from Matt Long - Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Integer vitae justo eget magna. Libero id faucibus nisl tincidunt eget. Elit duis tristique sollicitudin nibh. Sem fringilla ut morbi tincidunt augue interdum. Vivamus arcu felis bibendum ut. Quis commodo odio aenean sed adipiscing diam donec. Ac turpis egestas sed tempus urna et. Faucibus a pellentesque sit amet porttitor eget dolor. Odio ut sem nulla pharetra diam sit amet nisl suscipit. Fermentum iaculis eu non diam phasellus vestibulum. Nunc lobortis mattis aliquam faucibus. A diam maecenas sed enim ut sem. Feugiat vivamus at augue eget arcu. Tortor pretium viverra suspendisse potenti nullam ac. Ac turpis egestas sed tempus urna et pharetra pharetra. Urna porttitor rhoncus dolor purus non enim praesent. Sed euismod nisi porta lorem mollis aliquam ut porttitor leo. Et netus et malesuada fames.

Project submission deadline has passed